Arming and disarming cages

Of the movements of structures that the current industry demands, Orza makes inventories of parts and pieces that allows the reassembly of a center minimizing the variability of missing elements.

2019/07/30

Orza presents a new and complete silage pontoon

The system has modern architectural lines and greater capacity which means an approximate yield of 2,000 kilos per hour.

2019/07/30

New professionals join the Orza´s team

They will work in the areas of engineering, administration, warehouse, production, services, among others. Orza continues to grow and

2019/07/29

Orza manager gives talk to entrepreneurs

Orza is in the process of pre-assembling cage structures. Designed and built with a view to being shipped during

2019/07/29

Orza manager gives talk to entrepreneurs 2

Orza is in the process of pre-assembling cage structures. Designed and built with a view to being shipped during

2019/07/29

Orza manager gives talk to entrepreneurs 3

Orza is in the process of pre-assembling cage structures. Designed and built with a view to being shipped during